Improving Product Reliability : Strategies and Implementation


Mark A. Levin
Bok Engelsk 2003 · Electronic books.
Annen tittel
Utgitt
Hoboken : : Wiley, , 2003.
Omfang
1 online resource (343 p.)
Opplysninger
Description based upon print version of record.. - Improving Product Reliability; Contents; About the Authors; Series Foreword; Foreword; Preface; List of Acronyms; Acknowledgements; PART I Reliability - It's a Matter of Survival; 1 Competing in the Twenty-first Century; 1.1 Gaining competitive advantage; 1.2 Competing in the next decade - winners will compete on reliability; 1.3 Concurrent engineering; 1.4 Reducing the number of Engineering Change Orders (ECOs) at product release; 1.5 Time-to-market advantage; 1.6 Accelerating product development; 1.7 Identifying and managing risks; 1.8 ICM, a process to mitigate risk; Reference. - 2 Barriers to Implementing Reliability2.1 Lack of understanding; 2.2 Internal barriers; 2.3 Implementing change and change agents; 2.4 Building credibility; 2.5 Perceived external barriers; 2.6 It takes time to gain acceptance; 2.7 External barrier; 3 Understanding Why Products Fail; 3.1 Why things fail; 3.2 Parts have improved, everyone can build quality products; 3.3 Reliability - a twenty-first century paradigm shift; References; 4 Alternative Approaches to Implementing Reliability; 4.1 Hiring consultants; 4.2 Outsourcing reliability; PART II Unraveling the Mystery. - 5 The Product Life Cycle5.1 Six phases of the product life cycle; 5.1.1 Mitigate risk; 5.2 The ICM process for a small company; 5.2.1 DFx - Design for Manufacturability (DFM), Design for Test (DFT), Design for Serviceability (DFS) and Maintainability, and Design for Reliability (DFR); 5.2.2 Warranty; References; 6 Reliability Concepts; 6.1 The bathtub curve; 6.2 Mean Time Between Failure; 6.2.1 Mean time between repair; 6.2.2 Mean Time Between Maintenances (MTBM); 6.2.3 Mean Time To Failure (MTTF); 6.2.4 Mean Time To Repair (MTTR); 6.2.5 Mean Time To Restore System (MTTRS); 6.3 Warranty costs. - 6.4 Availability6.4.1 On-site manufacturer service personnel; 6.4.2 Customer trained service personnel; 6.4.3 Manufacturer training for customer service personnel; 6.4.4 Easy-to-Use service manuals; 6.4.5 Rapid diagnosis capability; 6.4.6 Repair and spare parts availability; 6.4.7 Rapid response to customer requests for service; 6.4.8 Failure data tracking; 6.5 Reliability growth; 6.6 Reliability demonstration testing; Reference; 7 The Reliability Toolbox; 7.1 The FMEA process; 7.1.1 The functional block diagram; 7.1.2 The fault tree analysis. - 7.1.3 Failure modes and effects analysis spreadsheet7.1.4 Preparing for the FMEA; 7.1.5 Barriers to the FMEA process; 7.1.6 FMEA ground rules; 7.2 The HALT process; 7.2.1 Types of stresses applied in HALT; 7.2.2 The theory behind the HALT process; 7.2.3 HALT testing; 7.3 Highly Accelerated Stress Screening (HASS); 7.3.1 Proof Of Screen (POS); 7.3.2 Burn-in; 7.3.3 Environmental Stress Screening (ESS); 7.3.4 Economic impact of HASS; 7.3.5 The HASA process; 7.4 Summary of HALT, HASS, HASA and POF benefits; 7.5 HALT and HASS test chambers; 7.6 SPC tool; 7.7 FIFO tool. - 7.8 Component derating - a first line of defense in product reliability. - The design and manufacture of reliable products is a major challenge for engineers and managers. This book arms technical managers and engineers with the tools to compete effectively through the design and production of reliable technology products.
Emner
Sjanger
Dewey
ISBN
0470854499

Bibliotek som har denne