MICROTURBO MAINTENANCE MANUAL SAPHIR 6 ALL VERSIONS : (and) SAPHIR 2 A.P.U. MAINTENANCE MANUAL
Bok Engelsk
Utgitt | Toulouse Cedex, France : Groupe Labinal Division Microturbo
|
---|---|
Opplysninger | Publishing date is not available for Saphir 6. Publishing date for Saphir 2 is December 1967. Last Revision, Rev. No. 7 May 1983, and Reissued : Sept/86. Publishing date for MAINTENANCE MANUAL SAPHIR 6 ALL VERSIONS (DT 74/14A) ISSUED: OCTOBER 1975 REVISION NO. 7: SEPTEMBER 1992. - TABLE OF CONTENTS: SAPHIR 6 POWER PLANT GENERAL 49-10-00 GENERAL 49-10-01 POWER PLANT GENERAL 49-11-10 COWLING 49-11-20 ELECTRICAL CABLE HARNESS 49-11-30 FIRE EXTINGUISHING SYSTEM SAPHIR 2 APU: TIME LIMITS (All 5-49-10) 1. Time Limits Code 2. Time Limits A. Scheduled Maintenance (1) Ultimate Life (2) TBO Life B. On Condition Maintenance C. Unlimited Life MAINTENANCE CHECKS (All 5-49-20) 1. Maintenance Check List 2. Maintenance Manual Breakout 3. Overhaul Manual Breakout Scheduled Maintenance Checks WM SM1 SM2 SM3 SM4 Unscheduled Maintenance Checks (All 5-49-50) 1. Cleaning Procedures : Fliter Elements A. Ultrasonic cleaning procedure SAPHIR 6: 1. Fuel A. Approved fuels B. Capacities C. Consumption 2. Oil A. Approved oils B. Capacities C. Consumption 3. Replenishments A. Oil level checks B. Replenishment of oil tank C. Visual examination for leaks MAINTENANCE MANUAL SAPHIR 6 ALL VERSIONS (DT 74/14A) ISSUED: OCTOBER 1975 REVISION NO. 7: SEPTEMBER 1992
|
Emner |